DE 10-188

2011 CORE ELECTRIC PROGRAMS AND NATURAL GAS ENERGY EFFICIENCY PROGRAMS

Energy Efficiency Programs

Click here to go to Comments Page

TAB

DATE

DESCRIPTION

FILED BY

1

08/03/10

NGrid-Unitil 2011-2012 Core NH Energy Efficiency Programs and the Gas Energy Efficiency Plan Electric Core and Gas Energy Efficiency Programs

Cover Letter
2011-2012 Core Joint Electric Program Proposal
2011-2012 Joint National Grid/Unitil Gas Efficiency Proposal

Gerald M. Eaton

2

08/04/10

Sec Acknowledgement Letter

Debra A. Howland

3

08/05/10

OCA Ltr of participation

Meredith A. Hatfield

4

08/09/10

Notice of Appearance of S Knowlton on behalf of GSEC

Cover Letter
Notice

Sarah B. Knowlton

5

08/11/10

OEP Petition to Intervene

Cover Letter
Petition

Eric Steltzer

6

08/12/10

Order of Notice

Debra A. Howland

7

08/20/10

NH Community Action Association Petition for Intervention

Cover Letter
Petition

Dana Nute

8

08/23/10

PSNH Affidavit of Publication

Gerald M. Eaton

9

08/26/10

The Way Home Petition to Intervene

Cover Letter
Petition

Alan Linder

10

08/26/10

Daniel Ramage and R. Jeremy Hill Petition for Intervention

Cover Letter
Petition

Daniel Ramage and R. Jeremy Hill

11

08/26/10

US Energy Saver LLC Petition for Intervention

Cover Letter
Petition

Russell Aney

12

08/26/10

Conservation Law Foundation Petition for Intervention

Cover Letter
Petition

N. Jonathan Peress

13

08/30/10

Home Builders and Remodelers Petition for Intervention

Cover Letter
Petition

Kendall L. Buck

14

08/31/10

Clerk Report

Staff

15

08/31/10

Joint Objection to the Petitions for Intervention of USES and D. Ramage and J. Hill

Cover Letter
Objection

Sarah B. Knowlton

16

08/31/10

Pre-Hearing Conference Sign in sheet

Staff

17

09/02/10

Staff Proposed Procedural Schedule

Staff

18

09/10/10

Missed Deadline in Proposed Procedural Schedule

Staff

19

09/10/10

NH Energy Trust Proposal to Administer Programs

Cover Letter
Proposal

Russell Aney

20

09/13/10

NH Energy Trust Proposal to Administer Programs-Corrected

Cover Letter
Proposal

Russell Aney

21

09/15/10

Transcript of hearing held on August 31, 2010

Condensed Version in Commission File

Steven E. Patnaude

22

09/16/10

New Hampshire Energy Trust slightly edited to assume the administration of the Natural Gas and Electric Residential Energy Efficiency Programs filed on September 10th and 13th 2010

Cover Letter
Edited filing

Daniel Ramage

23

09/16/10

New Hampshire Energy Trust Petition to substitute the intervention D. Ramage and R. Jeremy Hill with the intervention of NHET

Cover Letter
Substitute Intervention

Daniel Ramage

24

09/17/10

NH Housing Finance Authority Petition to Intervene

Cover Letter
Motion

Benjamin D. Frost

25

09/20/10

Joint Objection to the Scope of the Intervention and the Substitution of New Hampshire Energy Trust for Intervenors Daniel Ramage and R. Jeremy Hill

Cover Letter
Objection

Rachel Aslin Goldwasser

26

09/20/10

Department of Environmental Services Motion to Intervene

Cover Letter
Motion

Robert R. Scott

27

09/22/10

PSNH Joint Letter Reserving Rights to Serve Data Request on NHET Proposal and to Ramage-Hill to the extent the NHET Proposal suggests changes to 2011-2012 Program

Gerald M. Eaton

28

09/27/10

Sec Ltr Procedural Schedule

Debra A. Howland

29

10/07/10

Staff Modification to Procedural Schedule

Staff

30

10/13/10

Sec Ltr Late Interventions and Modification to Procedural Schedule

Debra A. Howland

31

10/15/10

Staff joint testimony of James J. Cunningham and Al-Azad Iqbal with Schedules

Cover Letter
Testimony J Cunningham and A Iqbal
Schedules

Staff

32

10/15/10

OCA Testimony-Stephen R. Eckberg

Cover Letter
Testimony

Meredith A. Hatfield

33

10/15/10

R. Jeremy Hill Direct Pre-filed Testimony-Hill

Cover Letter
Testimony

R. Jeremy Hill

34

10/15/10

OEP Prefiled Testimony-Eric Steltzer

Cover Letter
Testimony

Eric Steltzer

35

11/15/10

Rebuttal Testimony of Angela Li and Brain Kearney on behalf of EnergyNorth Natural Gas Inc. d/b/a National Grid NH and Thomas Palma on behalf of Northern Utilities, Inc.

Cover Letter
Testimony
Schedule

Rachel Aslin Goldwasser

36

11/15/10

NHEC prefiled Rebuttal Testimony of Carol Woods

Cover Letter
Testimony

Mark W. Dean

37

11/15/10

Staff Rebuttal Testimony of James J. Cunningham, Jr. and Al-Azad Iqbal

Cover Letter
Testimony

Staff

38

11/15/10

PSNH Rebuttal Testimony of Angela Li, Carol Woods, Thomas R. Belair, and Thomas Palma on behalf of the Electric Utilities

Cover Letter
Testimony
Attachments

Gerald M. Eaton

39

11/19/10

Revised Rebuttal Testimony of Angela Li and Brian Kearney on behalf of EnergyNorth Natural Gas Inc. d/b/a National Grid NH and Thomas Palma on behalf of Northern Utilities, Inc.

Cover Letter
Revised Testimony
Schedule

Rachel Aslin Goldwasser

40

12/09/10

Staff Modification to Procedural Schedule

Staff

41

12/13/10

Staff Ltr Recommendation RE: SB323 Energy Study Funding Proposal

Staff

42

12/14/10

Staff request for additional time to file Settlement Agreement

Staff

43

12/15/10

Jt. Settlement Agreement of the Utilities Staff -OCA and Several Intervenors

Cover Letter
Settlement

Meredith A. Hatfield

44

12/15/10

EnergyNorth Natural Gas d/b/a National Grid NH Motion for Protective Order and Confidential Treatment regarding OCA-2-1(b) Service Agreement
Confidential Material in Commission File

Cover Letter
Motion

Sarah B. Knowlton

45

12/16/10

Clerk Report
Exhibit list

Staff

46

12/20/10

GSEC Responses to Record Requests reserved as Exhibit 17 and 18

Cover Letter
Responses

Sarah B. Knowlton

47

12/22/10

Staff Ltr record request reserved as Exhibit 16

Cover Letter
Record Request

Staff

48

12/22/10

OEP Ltr record request DR-1 Hearing Exhibit 21

Cover Letter
Record Request

Eric Steltzer

49

12/22/10

UES Northern Record Request marked as Exhibits 17, 18 and 19

Cover Letter
Record Request

Rachel Aslin Goldwasser

50

12/23/10

PSNH Ltr Record Request marked as Exhibits 17-19 and 21

Cover Letter
Record Request

Thomas R. Belair

51

12/23/10

GSEC Revised Exhibit 17

Cover Letter
Revised Exhibit

Sarah B. Knowlton

52

12/28/10

GSEC Ltr Record Request marked as Exhibit 19

Cover Letter
Record Request

Sarah B. Knowlton

53

12/30/10

Order No. 25,189 Approving settlement agreement

Case Closed

NHPUC

54

01/03/11

Transcript of 12-16-10 hearing

Morning session

Condensed version in Commission file

Steven E. Patnaude

55

01/04/11

PSNH Delivery Service Tariff NHPUC No. 8, effective 1-1-11

Cover Letter
Tariff

Stephen R. Hall

56

01/04/11

EnergyNorth Natural Gas d/b/a National Grid NH Record Request marked as Exhibit 20 Redacted Service Agreement

Cover Letter
Agreement

Sarah B. Knowlton

57

01/06/11

Transcript of 12-16-10 hearing

Afternoon session

Condensed version in Commission file

Susan J. Robidas

58

01/07/11

NHEC Record Request marked as Exhibit 17

Cover Letter
Record Request

Carol Woods

59

01/21/11

Staff Ltr confirms compliance with Puc 1603 filing requirements

Staff

60

02/01/11

CORE and Gas Utilities 2011 Marketing Plan

Cover Letter
Marketing Plan

Rachel Aslin Goldwasser

61

02/11/11

CORE Ltr EnergyStar update to Commission

Rachel Aslin Goldwasser

62

03/31/11

Staff Ltr Recommendation

Staff

63

03/31/11

UES Solicitation of interest for Contractors in NH

Cover Letter
Solicitation

Thomas Palma

64

05/12/11

GSEC Tariff Page 6th revised page 77

Cover Letter
Tariff Page

Sarah B. Knowlton

65

05/13/11

NGrid NH March 2011 Monthly Energy Efficiency Report

Cover Letter
Report

Sarah B. Knowlton

66

05/16/11

Staff ltr update on the status of the HPwES Evaluation rpt

Staff

67

05/18/11

Sec Ltr granting extension of time

Debra A. Howland

68

06/15/11

NGrid NH April 2011 Monthly Energy Efficiency Report

Cover Letter
Report

Sarah B. Knowlton

69

06/15/11

Sec Ltr Re-Allocation of the Systems Benefits Charge

Debra A. Howland

70

06/21/11

Staff Ltr confirming compliance with Puc 1603 filing requirements

GSEC 6th revised page 77

Staff

71

06/24/11

GSEC/NGrid NH Notice of Appearances of Steven V. Camerino and Carol J. Holahan

Steven V. Camerino

72

07/05/11

GSEC/NGrid NH Notice of Withdrawal of Sarah B. Knowlton and Notice of Appearance of Steven V. Camerino and Carol Holahan

Cover Letter
Notice of Withdrawal
Notice of Appearance

Steven V. Camerino

73

07/12/11

UES Northern May 2011 Monthly Energy Efficiency Report

Cover Letter
Report

Karen M. Asbury

74

07/18/11

NGrid NH May 2011 Monthly Energy Efficiency Report

Cover Letter
Report

Jinjue Pak

75

07/25/11

Staff ltr update the Commission on 2011 M and E Program

Staff

76

08/02/11

PSNH 2011 1st qrtly report-Smart Start Energy Efficiency Program

Cover Letter
Report

Gilbert E. Gelineau

77

08/09/11

UES Northern June 2011 Monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons Jr.

78

08/12/11

NGrid NH June 2011 Monthly Energy Efficiency Report

Cover Letter
Report

Jinjue Pak

79

08/26/11

Staff ltr recommendation

Staff

80

08/29/11

GSEC - NGrid NH request of deadline extension for filings due between August 29, 20011 and September 2, 2011

Steven V. Camerino

81

08/31/11

Sec ltr granting extension of time

Debra A. Howland

82

09/01/11

PSNH/UES ltr proposed HPwES program for calendar year 2012

Sarah B. Knowlton

83

09/07/11

NGrid NH Ltr carrying forward 2010 gas energy budget funds to 2011 program year

Carol J. Holahan

84

09/08/11

Staff Ltr recommendation

Staff

85

09/13/11

UES Northern July 2011 Monthly Energy Efficiency Report

Cover Letter
Report

Karen M. Asbury

86

09/13/11

NGrid NH July 2011 Monthly Energy Efficiency Report

Cover Letter
Report

Jinjue Pak

87

09/30/11

Electric and Gas Utilities updates for program yr 2012

Cover Letter
Report

Sarah B. Knowlton

88

10/05/11

OCA ltr proposed schedule

Meredith A. Hatfield

89

10/13/11

UES Northern August 2011 Monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons Jr

90

10/14/11

NGrid NH August 2011 Monthly Energy Efficiency Report

Cover Letter
Report

Jinjue Pak

91

10/17/11

PSNH 2011 2nd qrtly report-Smart Start Energy Efficiency Program

Cover Letter
Report

Gilbert E. Gelineau, Jr.

92

10/18/11

Sec Ltr approving procedural schedule

Debra A. Howland

93

10//1/11

Core and Gas Utilities Marketing Plan for 2012

Cover Letter
Plan

Sarah B. Knowlton

94

11/10/11

OCA Testimony of Stephen R. Eckberg

Cover Letter
Testimony S Eckberg
Attachments S Eckberg

Meredith A. Hatfield

95

11/10/11

Staff Testimony of James Cunningham and Al-Azad Iqbal

Cover Letter
Testimony J Cunningham/A Iqbal
Attachments J Cunningham/A Iqbal

Staff

96

11/14/11

NGrid NH September 2011 Monthly Energy Efficiency Report

Cover Letter
Report

Jinjue Pak

97

11/15/11

UES Northern September 2011 Monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons Jr.

98

11/15/11

NGrid NH ltr to inform the commission that the company intends to transfer funds

Carol J. Holahan

99

12/07/11

NGrid NH ltr to inform the commission that the company intends to transfer funds within its residential sector

Carol J. Holahan

100

12/09/11

UES Northern October 2011 Monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons Jr.

101

12/13/11

PSNH Ltr Parties Requesting Extension of Time for Settlement

Gerald M. Eaton

102

12/13/11

OCA Ltr requesting extension of time to file rebuttal testimony

Meredith A. Hatfield

103

12/14/11

NGrid NH October 2011 Monthly Energy Efficiency Report

Cover Letter
Report

Jinjue Pak

104

12/15/11

Staff Ltr concurrence on rebuttal testimony extension

Staff

105

12/15/11

Sec Ltr Granting Extensions of Time

Debra A. Howland

106

12/15/11

PSNH Program Year 2012 Partial Settlement Agreement

Cover Letter
Partial Agreement
Attachments-Partial Agreement

Gerald M. Eaton

107

12/19/11

NGrid NH/UES-Northern Rebuttal Testimony of Eric Stanley and Thomas Palma

Cover Letter
Testimony-E. Stanley and T. Palma

Rachel Aslin Goldwasser

108

12/22/11

PSNH 2011 3rd qtr Smart Start Energy Efficiency Program

Cover Letter
Report

Gilbert E. Gelineau, Jr.

109

12/22/11

PSNH Additional signatures

Cover Letter
Signature pgs

Gerald M. Eaton

110

12/22/11

Clerk Report
Exhibits

Staff

111

01/03/12

Transcript of Hearing held on December 22, 2011

Steven E. Patnaude

112

01/03/12

Sec Ltr Commission authorization to expend SBC funds until further decision is rendered

Debra A. Howland

113

01/09/12

Order No 25,315 Approving 2012 Energy Efficiency Programs Updates

NHPUC

114

01/09/12

PSNH 3rd Quarter 2011 Energy Efficiency CORE Report and Request for Waiver

Cover Letter
Report

Gerald M. Eaton

115

01/12/12

UES Northern November 2011 Monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons

116

01/17/12

NGrid NH Nov 2011 Monthly Energy Efficiency Report

Cover Letter
Report

Jinjue Pak

117

02/01/12

Staff Ltr Proposed Procedural Schedule

Staff

118

02/02/12

Sec ltr approving Procedural Schedule

Debra A. Howland

119

02/15/12

NGrid NH December 2011 Monthly Energy Efficiency Report

Cover Letter
Report

Jinjue Pak

120

02/15/12

PSNH Jt Testimony of Gilbert Gelineau and Thomas Palma for PSNH and UES

Cover Letter
Jt Testimony
Attachments

Marked as Exhibit #29 at 06/06/12 hearing

Gerald M. Eaton

121

02/15/12

UES Northern December 2011 Monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons Jr.

122

03/01/12

OCA Ltr Modification to Service Lists for Electric Utilities

Meredith A. Hatfield

123

03/01/12

PSNH End of Year 2011 Energy Efficiency CORE Report

Cover Letter
Report

Gerald M. Eaton

124

03/08/12

UES Northern January 2012 Monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons Jr.

125

03/08/12

PSNH 2011 4th qtr Smart Start Energy Efficiency Program Report

Cover Letter
Report

Gilbert E. Gelineau, Jr.

126

03/12/12

NGrid NH 2011 program year end report

Cover Letter
Report

Carol J. Holahan

127

03/12/12

UES Northern 2011 Carryover Funds

Cover Letter
Report

Rachel Aslin Goldwasser

128

03/15/12

NGrid NH January 2012 Monthly Energy Efficiency Report

Cover Letter
Report

Jinjue Pak

129

03/22/12

Staff Direct Testimony of James J. Cunningham and Al-Azad Iqbal

Cover Letter
Testimony-J. Cunningham and A. Iqbal
Attachments

Marked as Exhibit #35 at 06/06/12 hearing

Staff

130

03/23/12

OCA Testimony of Stephen R. Eckberg

Cover Letter
Testimony
Attachment

Marked as Exhibit 47 at 06/18/12 hearing

Rorie E.P. Hollenberg

131

03/26/12

NGrid NH revised 2011 Program Yr End Results - including Exhibit C

Cover Letter
Report with Exhibit C included

Carol J. Holahan

132

03/28/12

Northern Exhibit C to the 2011 Carryover Funds Report, filed March 12, 2012

Cover Letter
Exhibit C

Rachel Aslin Goldwasser

133

03/28/12

PSNH Ltr description of CEP Program

Gerald M. Eaton

134

03/28/12

Office of Energy Planning Prefiled Testimony of Eric

Steltzer

Cover Letter
Testimony

Marked as Exhibit 40 at 06/18/12 hearing

Eric Steltzer

135

04/04/12

Northern Ltr Budget Transfer between C and I Programs

Rachel Aslin Goldwasser

136

04/12/12

Northern February 2012 Monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons Jr.

137

04/13/12

NGrid NH February 2012 Monthly Energy Efficiency Report

Cover Letter
Report

Jinjue Pak

138

04/17/12

GSEC Ltr Budget transfers within the C and I sector of CORE programs

Carol J. Holahan

139

04/19/12

Staff Ltr recommendation

Staff

140

04/20/12

PSNH tariff 1st rev pgs 100 and 101, Technical Statement of Gilbert E. Gelineau Jr. in support of a Tariff change to the Residential Energy Efficiency Loan Program and a draft of the contract between NHCDFA and PSNH

Cover Letter
Statement with draft of contract
Tariff pages

Gerald M. Eaton

141

05/04/12

UES Northern/PSNH Jt Rebuttal Testimony of Gilbert E. Gelineau, Jr. and Thomas Palma

Cover Letter
Testimony

Marked as Exhibit #30 at 06/06/12 hearing

Rachel Goldwasser

142

05/04/12

OCA Rebuttal Testimony of Stephen R. Eckberg

Cover Letter
Testimony
Attachments

Marked as Exhibit 48 at 06/18/12 hearing

Rorie E. P. Hollenberg

143

05/04/12

Staff Rebuttal Testimony of James J. Cunningham and Al-Azad Iqbal

Cover Letter
Testimony
Attachments

Marcia A. B. Thunberg

144

05/10/12

Northern March 2012 Monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons Jr.

145

05/15/12

Order No. 25,365 Approving Revised Natural Gas Energy Efficiency Budgets for 2012

NHPUC

146

05/15/12

NGrid NH March 2012 Monthly Energy Efficiency Report

Cover Letter
Report

Jinjue Pak

147

05/16/12

PSNH 1st Quarter 2012 Energy Efficiency Core rpt

Cover Letter
Report

Gerald M. Eaton

148

05/18/12

PSNH Ltr Discussion with Staff regarding BetterBuildings Program

Gerald M. Eaton

149

05/21/12

Staff Ltr Concurrence with PSNH Tariff Revisions for CDFA Grant

Staff

150

05/21/12

Sec Ltr Accepting Staff Recommendation

Debra A. Howland

151

05/30/12

PSNH 2012 1st qtr Smart Start Energy Efficiency Program Report

Cover Letter
Report

Gilbert E. Gelineau, Jr.

152

05/31/12

NGrid NH Motion for Extension of Time to file Shareholder Incentive Calculation Report

Cover Letter
Motion

Carol J. Holahan

153

06/01/12

GSEC Motion for Extension of Time to file Shareholder Incentive Calculation Report

Cover Letter
Motion

Carol J. Holahan

154

06/01/12

UES Northern Calculations of Shareholder Incentive

Cover Letter
Calculations-Northern
Calculations-UES

Rachel Aslin Goldwasser

155

06/04/12

PSNH 2011 CORE Programs Performance Incentive

Cover Letter
Report

Gerald M. Eaton

156

06/06/12

Clerk Report
Exhibits

Staff

157

06/08/12

UES Addendum Calculations of Shareholder Incentive

Cover Letter
Calculations

Rachel Aslin Goldwasser

158

06/13/12

Northern April 2012 Monthly Energy Efficiency Report

Cover Letter
Report

Karen M. Asbury

159

06/13/12

Sec Ltr granting NGrid NH Motion for Extension of Time to file Shareholder Incentive Calculation Report

Debra A. Howland

160

06/13/12

Sec Ltr granting GSEC Motion for Extension of Time to file Shareholder Incentive Calculation Report

Debra A. Howland

161

06/15/12

NGrid NH April 2012 Monthly Energy Efficiency Report

Cover Letter
Report

Jinjue Pak

162

06/15/12

UES Ltr Parke Place Home Performance with Energy Star Project and Request for Waivers

Rachel Aslin Goldwasser

163

06/15/12

Transcript of hearing held on June 6, 2012 Day 1 A.M. Session and Early P.M. Session

Condensed Version in Commission File not scanned

Steven E. Patnaude

164

06/18/12

Clerk Report
Exhibits

Staff

165

06/21/12

GSEC Revised 2011 year end Energy Efficiency Report

Cover Letter
Report
Attachments

Carol J. Holahan

166

06/22/12

Clerk Report
Exhibits

Staff

167

06/22/12

Transcript of hearing held on June 6, 2012 -Day 1 midafternoon session
Condensed version

Susan J. Robidas

168

06/25/12

Transcript of hearing held on June 18, 2012-Day 2

Condensed version in Commission File not scanned

Steven E. Patnaude

169

06/26/12

PSNH Ltr of Withdrawal of S. Knowlton and Appearance of R. Bersak

Sarah B. Knowlton

170

06/28/12

Transcript of hearing held on June 22, 2012 -Day 3
Condensed version

Susan J. Robidas

171

06/29/12

Sec ltr approving deadline for filing briefs is July 9, 2012

Debra A. Howland

172

07/06/12

McLane Law Firm's ltr requesting to be removed from service list

Steven V. Camerino

173

07/09/12

OCA Closing Statement

Cover Letter
Statement

Rorie E.P. Hollenberg

174

07/09/12

Liberty Ltr Appearance of Sarah B. Knowlton

Sarah B. Knowlton

175

07/09/12

Staff Closing Statement

Cover Letter
Statement

Staff

176

07/09/12

PSNH Closing Statement

Cover Letter
Statement

Robert A. Bersak

177

07/09/12

The Way Home Closing Statement

Cover Letter
Statement

Alan Linder

178

07/09/12

UES Closing Statement

Cover Letter
Statement

Rachel Aslin Goldwasser

179

07/09/12

OEP Closing Statement

Eric Steltzer

180

07/10/12

Staff ltr filing HB 1490 into the docket so that all persons on the service list can view it

Staff

181

07/10/12

Liberty Utilities Ltr on behalf of GSEC and ENNG supporting Closing Statements filed by PSNH and UES

Sarah B. Knowlton

182

07/13/12

Supplemental Order of Notice relative to Electric Utilities

Debra A. Howland

183

07/16/12

Northern May 2012 Monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons, Jr.

184

07/17/12

Liberty May 2012 Monthly Energy Efficiency Report

Cover Letter
Report

ChristiAne G. Mason

185

07/17/12

UES ltr notifying NHPUC that it will make the following budget transfers

Rachel Aslin Goldwasser

186

07/19/12

Community Loan Fund request for late intervention

Cover Letter
Petition

Richard A. Minard, Jr.

187

07/23/12

RMANH Petition to intervene

Cover Letter
Petition

Jim Monahan

188

07/24/12

NHHFA Ltr of Appearance of Benjamin D. Frost

Benjamin D. Frost

189

07/26/12

NHDES Ltr requesting that Rebecca Ohler be listed as their representative in this docket

Craig A. Wright

190

07/27/12

CLF Ltr of Appearance of Christophe G. Courchesne

Christophe G. Courchesne

191

07/27/12

Jordan Institute Petition to Intervene

Cover Letter
Petition

D. Dickinson Henry, Jr.

192

07/27/12

TRC Petition to Intervene

Cover Letter
Petition

Tom Rooney

193

07/30/12

Sec Ltr granting Interventions

Debra A. Howland

194

07/31/12

NHEC Ltr Better Buildings Collaborative with CDFA

Carol Woods

195

07/31/12

EESE Board ltr recommendation of disposition of RGGI Funds

Marked as Exhibit 60 at 08/30/12 hearing

George Gantz

196

08/03/12

Staff Report on Technical Session on Impact of House Bill 1490 and Proposed Procedural Schedule

Staff

197

08/06/12

Sec Ltr approving schedule and granting extension of time

Debra A. Howland

198

08/09/12

Staff ltr for clarification of Procedural Schedule

Staff

199

08/10/12

Jt Utilities Proposal for the use of RGGI funds during remaining months of 2012 Core Program year

Cover Letter
Proposal

Marked as Exhibit 57 at 08/30/12 hearing

Robert A. Bersak

200

08/10/12

The Jordan Institute-Intervenors and Parties of Interest comments

Cover Letter
Comments

Marked as Exhibit 58 at 08/30/12 hearing

D. Dickinson Henry Jr.

201

08/10/12

Northern June 2012 monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons, Jr.

202

08/14/12

The Way Home ltr response to the Jt Utility and The Jordan Institute Proposal for use of RGGI funds for 2012

Marked as Exhibit 59 at 08/30/12 hearing

Dan Feltes & Alan Linder

203

08/16/12

Sec Ltr scheduling a hearing

Debra A. Howland

204

08/17/12

Staff Ltr - comments on proposals to use RGGI funds

Marked as Exhibit 63 at 08/30/12 hearing

Staff

205

08/17/12

CLF Ltr - comments on proposals to use RGGI funds

Marked as Exhibit 64 at 08/30/12 hearing

N. Jonathan Peress

206

08/17/12

The Jordan Institute Ltr - comments on proposals to use RGGI funds

Marked as Exhibit 61 at 08/30/12 hearing

D. Dickinson Henry Jr.

207

08/17/12

OCA Ltr - comments on proposals to use RGGI funds

Marked as Exhibit 62 at 08/30/12 hearing

Rorie E.P. Hollenberg

208

08/21/12

UES Tariff revisions and recently executed Agreement with CDFA

Cover Letter
Tariff pages
Agreement

Tariff pgs NHPUC No. 3 1st rev pgs 110, 111

Tariff pgs NHPUC No. 10 Original pgs 153,154

Gary Epler

209

08/21/12

ENNE dba Liberty June 2012 Monthly Energy Efficiency Report

Cover Letter
Report

ChristiAne G. Mason

210

08/21/12

PSNH 2nd Quarter 2012 Energy Efficiency CORE rpt

Cover Letter
Report

Robert A. Bersak

211

08/23/12

Order No. 25,402 Home Performance with Energy Star Program

NHPUC

212

08/24/12

UES Revised Tariff pgs

Cover Letter
Tariff Pgs
Tariff Original pgs 152-b and 152-c

Gary Epler

213

08/27/12

NHCLF Ltr-Comments on proposals to use RGGI funds

Marked as Exhibit 67 at 08/30/12 hearing

Richard A. Minard, Jr.

214

08/27/12

NHEC 2011 year end Calculation of Member Incentive

Cover Letter
Report

Carol Woods

215

08/29/12

TRC Comments on proposals to use RGGI funds

Marked as Exhibit 65 at 08/30/12 hearing

Tom Rooney

216

08/29/12

NHCAA Comments on proposals to use RGGI funds

Marked as Exhibit 68 at 08/30/12 hearing

Dana Nute

217

08/29/12

DES Comments on proposals to use RGGI funds

Marked as Exhibit 66 at 08/30/12 hearing

Rebecca E. Ohler

218

08/29/12

Northern Forest Center email to Chairman Ignatius-Comments on proposals to use RGGI funds

Joe Short

219

08/29/12

Northern Forest Center email to Commissioner Harrington-Comments on proposals to use RGGI funds

Joe Short

220

08/30/12

Clerks Report
Exhibits

Staff

221

09/07/12

Jt Intervenors Revised Proposal to Use RGGI Funds in CORE Programs

Cover Letter
Revised Proposal

D. Dickinson Henry Jr.

222

09/10/12

PSNH Ltr Appearance of Matthew J. Fossum

Matthew J. Fossum

223

09/11/12

Jt Motion for extension of time to file information

Cover Letter
Motion

Matthew J. Fossum

224

09/12/12

Northern July 2012 monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons, Jr.

225

09/13/12

Staff Ltr GHGERF balance of funds

Staff

226

09/14/12

Transcript of hearing held on August 30, 2012-AM

Steven E. Patnaude

227

09/14/12

Transcript of hearing held on August 30, 2012-PM
Transcript of hearing held on August 30, 2012-PM-condensed

Susan J. Robidas

228

09/14/12

Staff Comments on Intervenors revised proposal for use of 2012 RGGI funds

Staff

229

09/14/12

Sec ltr granting extension of time

Debra A. Howland

230

09/14/12

Northern Ltr Notification of Budget Transfer

Rachel Aslin Goldwasser

231

09/14/12

CLF Comments on Intervenors revised proposal for use of 2012 RGGI funds

Christophe G. Courchesne

232

09/14/12

The Way Home Comments on Intervenors revised proposal for use of 2012 RGGI funds

Alan Linder

233

09/14/12

Electric Utilities Comments on Intervenors revised proposal for use of 2012 RGGI funds

Rachel Aslin Goldwasser

234

09/18/12

ENGI dba Liberty July 2012 Monthly Energy Efficiency Report

Cover Letter
Report

ChristiAne G. Mason

235

09/19/12

Liberty Ltr request for service list change

Sarah B. Knowlton

236

09/20/12

Staff Ltr concurrence with Unitil and Northern Tariff Revisions for CDFA Grant

Staff

237

09/24/12

UES Tariff Revisions

Tariff 1st rev pg 110, 111 and Original Pg 154

Gary Epler

238

09/28/12

UES Tariff Revisions

Cover Letter
Tariff
Tariff Original pg 152-c

Rachel Aslin Goldwasser

239

10/02/12

Sec Ltr Tariff effective by operation of law

Debra a. Howland

240

10/03/12

UES Northern Ltr will begin immediately implementing the programs described in the agreement

Rachel Aslin Goldwasser

241

10/04/12

UES Tariff Revisions

Cover Letter
Tariff Pages

Tariff Original Pg 152-b and 152-c

Gary Epler

242

10/05/12

UES Tariff Revisions

Cover Letter
Tariff pages

1st rev pgs 110, 111

Gary Epler

243

10/09/12

PSNH 2nd Quarter 2012 Smart Start Energy Efficiency Program Report

Cover Letter
Report

Gilbert E. Gelineau, Jr.

244

10/15/12

Staff Ltr of compliance

1st rev pgs 110, 111

Staff

245

10/15/12

Northern August 2012 monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons, Jr.

246

10/16/12

ENGI dba Liberty August 2012 monthly Energy Efficiency Report

Cover Letter
Report

ChristiAne G. Mason

247

10/17/12

Order No. 25,425 Approving with Modifications Joint Utility Proposal for the Use of 2012 RGGI Funds

NHPUC

248

10/30/12

New England Wood Pellet Ltr requesting that Charles Niebling be added to the email service list

Charles R. Niebling

249

11/14/12

Northern Sept 2012 monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons, Jr.

250

11/16/12

ENGI dba Liberty September 2012 monthly Energy Efficiency Report

Cover Letter
Report

ChristiAne G. Mason

251

11/20/12

ENGI dba Liberty September 2012 Updated monthly Energy Efficiency Report

Cover Letter
Report

ChristiAne G. Mason

252

11/30/12

PSNH 3rd Quarter 2012 Energy Efficiency Rpt

Tom Belair

253

12/07/12

ENGI dba Liberty notification of budget transfer

Sarah B. Knowlton

254

12/14/12

ENGI dba Liberty October 2012 Monthly Energy Efficiency Report

Cover Letter
Report

ChristiAne G. Mason

255

12/18/12

PSNH 2012 3rd qtr Smart Start Energy Efficiency Program Report

Cover Letter
Report

Gilbert E. Gelineau, Jr.

256

12/18/12

Northern October 2012 monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons, Jr.

257

01/15/13

Northern November 2012 monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons, Jr.

258

01/31/13

UES 2012 Program year requests

Cover Letter
Request

Rachel Aslin Goldwasser

259

01/31/13

Northern 2012 Program year requests

Cover Letter
Requests

Rachel Aslin Goldwasser

260

02/12/13

PSNH Ltr responding to request of Order No. 25,425

Cover Letter
Attachment

Matthew J. Fossum

261

02/14/13

Northern December 2012 monthly Energy Efficiency Report

Cover Letter
Report

George H. Simmons, Jr.

262

02/15/13

ENGI dba Liberty December 2012 Monthly Energy Efficiency Report

Cover Letter
Report

ChristiAne G. Mason

263

02/27/13

Staff Ltr Recommendation

Staff

264

03/13/13

PSNH 4th Quarter 2012 Energy Efficiency Rpt

Cover Letter
Report

Matthew J. Fossum

265

03/14/13

PSNH 2012 4th qtr Smart Start Energy Efficiency Program Report

Cover Letter
Report

Gilbert E. Gelineau, Jr.

266

03/21/13

PSNH Ltr requesting permission to use the 2012 RGGI funds in the HEA for the installation of new furnaces in manufactured houses

Matthew J. Fossum

267

04/05/13

Sec Ltr approving changes for the 2012 Core HEA program

Debra A. Howland

268

04/23/13

Staff Ltr HPwES Ancillary Electric Savings and Air Conditioning Savings Research
Attachment

Staff

269

05/31/13

ENGI dba Liberty 2012 Calculation of Shareholder Incentive Report

Cover Letter
Report

Sarah B. Knowlton

270

05/31/13

PSNH 2012 Calculation of Shareholder Incentive Report

Cover Letter
Report

Matthew J. Fossum

271

05/31/13

UES Northern 2012 Calculations of Shareholder Incentive Report

Cover Letter
Report-UES
Report-Northern

Rachel Aslin Goldwasser

272

06/24/13

GSEC dba Liberty 2012 Calculations of Shareholder Incentive Report

Cover Letter
Report

ChristiAne G. Mason

273

06/24/13

GSEC dba Liberty rev shareholder incentives and final fund balance 2011 CORE Report

Cover Letter
Report

Sarah B. Knowlton

274

07/01/13

Staff Final Audit Reports of the 2011 CORE Electricity and Gas Efficiency Programs

GSEC dba Liberty, NHEC, PSNH, UES, Northern

Staff

275

07/08/13

GSEC dba Liberty Revised 2011 Calculations of Shareholder Incentive Report

Cover Letter
Revised Report

ChristiAne G. Mason

276

07/16/13

Staff Final Audit Reports of the 2011 CORE Electricity and Gas Efficiency Programs

ENGI dba Liberty

Staff

277

07/29/13

ENGI dba Liberty rev shareholder incentives 2011 CORE rpt

Cover Letter
Report

Sarah B. Knowlton

278

08/0713

NHEC 2012 Calculation of Shareholder Incentive Report

Cover Letter
Report

Carol Woods

279

08/07/13

NHEC Rev 2011 Calculation of Shareholder Incentive Report

Cover Letter
Report

Carol Woods

280

09/12/13

NHEC Revised 2012 Calculation of Shareholder Incentive Report

Cover Letter
Report

Carol Woods

281

01/07/14

New Hampshire Legal Assistance request for service list changes

Alan Linder

282

05/23/14

Liberty (ENGI) dba Liberty rev shareholder incentives 2012 CORE rpt

Cover Letter
Report

Sarah B. Knowlton

283

05/28/14

Staff Final Audit Reports of the 2012 CORE Electricity and Gas Efficiency Programs

NHEC, Northern, UES, PSNH, Liberty (ENGI) dba Liberty, Liberty (GSEC) dba Liberty

Staff

284

06/02/14

PSNH Annual Report and Performance Incentive Calculation

Cover Letter
Report

Matthew J. Fossum

285

06/11/14

Liberty (GSEC) dba Liberty 2012 Revised Year End Report

Cover Letter
Revised Report

Stephen R. Hall

286

07/30/14

NHEC Calculation of Member Incentive Report for 2013

Cover Letter
Report

Carol Woods

287

06/15/15

Conservation Law Foundation request for service list changes

Christophe Courchesne

288

07/02/18

Conservation Law Foundation request for service list changes

Johanne S. Van Rossum

 

 