26,442 | 12/29/20 | DW 20-157 | Pennichuck Water Works, Inc. | Petition for Approval of Bond Financing and Fixed Assed Line of Credit, Order Approving Financing |
26,441 | 12/29/20 | DE 20-165 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Electric Lines Over and Across the Exeter River in Danville and Land Owned by the State of New Hampshire in Sandown, Order Nisi Granting License |
26,440 | 12/29/20 | DE 20-092 | Gas and Electric Utilities | 2021-2023 New Hampshire Statewide Energy Efficiency Plan, Order Approving Short-Term Extension of 2020 Energy Efficiency Programs and System Benefits Charge Rate |
26,439 | 12/23/20 | DE 19-057 | Public Service Company of New Hampshire d/b/a Eversource Energy | Notice of Intent to File Rate Schedules, Order Following Hearing on 2019 Step Adjustment |
26,437 | 12/18/20 | DW 20-117 | Hampstead Area Water Company, Inc. | Request for Change in Rates, Order Suspending Proposed Tariffs and Scheduling Prehearing Conference |
26,438 | 12/17/20 | DE 20-054 | Public Service Company of New Hampshire d/b/a Eversource Energy | 2020 Energy Service Solicitation, Order Approving Adjustment to Energy Service Rate for Effect on February 1, 2021 |
26,436 | 12/17/20 | DW 20-156 | Pennichuck East Utility, Inc. | Request for Change in Rates, Order Suspending Tariff and Scheduling Prehearing Conference |
26,434 | 12/17/20 | DE 20-005 | Public Service Company of New Hampshire d/b/a Eversource Energy | Audit of Divestiture-Related Costs, Order Approving Stranded Cost Recovery Following Divestiture |
26,432 | 12/17/20 | DE 18-171 | New Hampshire Transmission, LLC. | Petition of New Hampshire Transmission, LLC for Approval of Financing. Request for Extension, Order Approving Extension |
26,435 | 12/16/20 | DW 20-153 | Pittsfield Aqueduct Company, Inc. | Request for Change in Rates. It is an Order Suspending Tariff and Scheduling Prehearing Conference |
26,433 | 12/15/20 | DE 19-057 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Permanent and Temporary Rates, Order Approving Settlement and Permanent Rates |
26,431 | 12/14/20 | DE 20-053 | Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities | 2020 Default Service Solicitations, Order Approving Solicitation Process and Resulting Rates |
26,430 | 12/11/20 | DE 20-099 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Licenses to Modify, Construct and Maintain Electric Lines Over and Across the Merrimack River Between Nashua and Hudson, Order Nisi Granting License |
26,429 | 12/03/20 | DW 19-091 | Pennichuck Water Works, Inc. | Petition for Declaratory Ruling and Request for Mediation, Order Regarding Special Contract Terms |
26,428 | 12/02/20 | DG 20-152 | Liberty Utilities (EnergyNorth Natural Gas) Corp. d/b/a Liberty Utilities Keene Division | Winter 2020-2021 Cost of Gas, Order Approving Cost of Gas Rates |
26,427 | 11/30/20 | DW 20-112 | Abenaki Water Company, Inc. | Request for Change in Rates, Order Suspending Proposed Tariffs |
26,426 | 11/25/20 | DW 17-165 | Abenaki Water Company, Inc. Rosebrook Water System. | Petition for Change in Rates, Order Denying Step II Deadline Extension |
26,425 | 11/24/20 | DW 19-084 | Pennichuck Water Works, Inc. | Request for Change in Rates, Order Approving Final Revenue Requirement and Resulting Rates |
26,424 | 11/24/20 | DW 20-064 | Pennichuck Water Works, Inc. | Emergency Petition for Financing Approval Under the Federal Paycheck Protection Program, Order Extending Submission Date |
26,423 | 11/12/20 | DE 20-042 | Public Service Company of New Hampshire, d/b/a Eversource Energy | Petition for Amended License to Construct and Maintain Electric Lines Over and Across the Pemigewasset River between Hill and New Hampton, Order Nisi Granting Amended License |
26,422 | 11/06/20 | DE 20-097 | Unitil Energy Systems, Inc. | Issued in Request to Amend Tariff and Provide a Non-Residential Energy Efficiency Loan to the City of Concord, Order Nisi Granting Request |
26,421 | 10/30/20 | DG 20-152 | Liberty Utilities (EnergyNorth Natural Gas) Corp. d/b/a Liberty Utilities – Keene Division | Winter 2020-2021 Cost of Gas, Order Approving Interim Cost of Gas Rates |
26,420 | 10/30/20 | DG 20-154 | Northern Utilities, Inc. | 2020-2021 Cost of Gas, Order Approving Cost of Gas Rates and Other Charges |
26,419 | 10/30/20 | DG 20-141 | Liberty Utilities (EnergyNorth Natural Gas) Corp. d/b/a Liberty Utilities | Winter 2020/2021 Cost of Gas and Summer 2021 Cost of Gas Filing, Order Approving Cost of Gas Rates and Other Charges |
26,418 | 10/30/20 | DW 20-081 | Pennichuck East Utilities | Petition for Approval of Financings from CoBank, ACB and Refinancing of Intercompany Loans, Order Approving Financing |
26,417 | 10/16/20 | DE 20-066 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Licenses to Construct and Maintain Electric Lines Over and Across the Souhegan River in Greenville and Land Owned by the State of New Hampshire in Mason and Greenville, Order Granting Licenses |
26,416 | 10/14/20 | DE 20-073 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Licenses to Construct and Maintain Electric Lines Over and Across Land Owned by the State in the Towns of Goffstown and Hooksett, Order Nisi Granting Two Licenses |
26,415 | 10/8/20 | DE 20-092 | Gas and Electric Utilities | 2021-2023 New Hampshire Statewide Energy Efficiency Plan, Order Denying Motion to Designate Staff Advocates |
26,414 | 10/6/20 | DE 20-039 | Unitil Energy Systems, Inc. | Petition for Approval of Energy Service Solicitations and Resulting Rates for Small, Medium, and Large Customer Groups Beginning December 1, 2020, Order Approving Petition |
26,409 | 10/6/20 | DG 17-198 | Liberty Utilities (EnergyNorth Natural Gas) Corp. d/b/a Liberty Utilities | Petition to Approve Firm Supply and Transportation Agreements and the Granite Bridge Project, Order Denying Motion to Amend Petition |
26,413 | 10/5/20 | DE 20-131 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Electric Lines Over and Across the Ashuelot River in Keene, Order Nisi Granting License |
26,412 | 9/30/20 | DG 20-105 | Liberty Utilities (EnergyNorth Natural Gas) Corp. d/b/a Liberty Utilities | Petition for Permanent and Temporary Rates, Order Approving Temporary Rates |
26,410 | 9/29/20 | DW 20-044 | Abenaki Water Company, Inc. | Petition for Approval of Financing from the Drinking Water and Groundwater Trust Fund, Order Nisi Approving Drinking Water and Groundwater Trust Fund Financing |
26,407 | 9/28/20 | DW 19-147 | Hampstead Area Water Company, Inc. | Petition for Approval to Accept Drinking Water and Groundwater Trust Fund Grant and Financing, Bank Financing, and Motion for Bifurcation, Order Nisi Approving DWGTF Financing and Motion for Bifurcation |
26,411 | 9/25/20 | DE 20-103 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Lines Over and Across State-Owned Land in Merrimack, New Hampshire, Order Nisi Granting License |
26,408 | 9/23/20 | DE 19-120 | Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities | 2019 Least cost Integrated Resource Plan, Order Approving Settlement Agreement |
26,406 | 9/21/20 | DE 20-058 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Electric Lines Over and Across State-Owned Land in Canterbury, Order Nisi Granting License |
26,405 | 9/18/20 | DE 20-123 | Statewide Low-Income Electric Assistance Program | 2020-2021 Program Administrative Budgets, Order Approving Budgets |
26,403 | 9/11/20 | DE 19-157 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Electric and Telecommunications Lines Over and Across Lands Owned by the State of New Hampshire in Swanzey and Winchester, Order Nisi Granting Three Licenses |
26,402 | 9/9/20 | DE 20-033 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Electric Lines Over and Across State Owned Land in Raymond, Order Nisi Granting License |
26,404 | 9/9/20 | DE 20-001 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Licenses to Construct and Maintain Electric Lines Over and Across Pequawket Pond and the Saco River in Conway and Across Land Owned by the State of New Hampshire in Tamworth, Madison, and Conway, Order Nisi Granting Licenses |
26,401 | 9/2/20 | DE 20-034 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Amended License to Construct and Maintain Electric Lines Over and Across the Isinglass River in Strafford, Order Nisi Granting Amended License |
26,400 | 8/31/20 | DE 20-096 | New England Power Company d/b/a National Grid | Petition for Approval to Issue Long-Term Debt Securities and Request for Rule Waiver, Order Approving Petition for Authority to Issue Long-Term Debt and Granting Waiver |
26,399 | 8/28/20 | DG 15-362 DG 16-852 |
Liberty Utilities (EnergyNorth Natural Gas) Corp. d/b/a Liberty Utilities | Petition for Expansion of Franchise to Towns of Pelham and Windham and Petition for Expansion of Franchise to the Town of Hanover and City of Lebanon, Order Recognizing Expiration of Franchise Authority in Windham, Hanover, and Lebanon |
26,398 | 8/27/20 | DT 20-068 | Sprint Communications Company, L. P. | Request for Rate Adjustment for Telecommunications Relay Service, Order Nisi Approving Rate Adjustment |
26,397 | 8/27/20 | DG 20-013 | Residential Low Income Assistance Program for Natural Gas Customers a/k/a Gas Assistance Program | Consideration of Program Design Change, It is an Order Approving Settlement Agreement |
26,396 | 8/20/20 | DE 19-162 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Electric Lines Over and Across the Androscoggin River and Moose Brook, and Land Owned by the State of New Hampshire in Whitefield, Gorham, and Randolph. It is an Order Nisi Granting License |
26,395 | 8/19/20 | DG 20-105 | Liberty Utilities (EnergyNorth Natural Gas) Corp. d/b/a Liberty Utilities | Petition for Permanent and Temporary Rates, Order Suspending Tariff and Scheduling Prehearing Conference and Hearing on Temporary Rates |
26,394 | 8/19/20 | DE 20-004 | Electric Distribution Utilities | Investigation in to Rate Design Standards for Electric Vehicle Charging Stations and Electric Vehicle Time of Day Rates, Order Determining the Appropriateness of Rate Design Standards for Electric Vehicle Charging Stations Pursuant to SB 575 |
26,393 | 8/12/20 | DW 20-071 | Atkinson Area Wastewater Recycling, Inc. | Request for Change in Rates and Request for Waiver of Puc 1604.01 Requirements, Order Suspending Tariff and Establishing a Prehearing Conference |
26,392 | 8/10/20 | DE 19-057 | Public Service Company of New Hampshire d/b/a Eversource Energy | Motion of the OCA for Rehearing or Reconsideration, Order Denying Motion for Rehearing or Reconsideration |
26,391 | 8/6/20 | DE 20-076 | Unitil Energy Systems, Inc. | Petition for Authority to Issue Securities. It is an Order Approving Financing Petition |
26,390 | 7/31/20 | DE 20-072 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Approval of Financing Transaction, Order Nisi Approving Financing Transaction |
26,389 | 7/31/20 | DE 20-014 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Licenses to Construct and Maintain Electric Lines Over and Across the Blackwater River in Andover, Cascade Brook in Wilmot and State-Owned Land in Springfield and Franklin, Order Nisi Granting Licenses |
26,388 | 7/31/20 | DE 20-098 | Unitil Energy Systems, Inc. | Annual Reconciliation and Rate Filing for Stranded Costs and External Delivery Charge, Order Approving Rate Adjustments |
26,387 | 7/31/20 | DE 20-095 | Public Service Company of New Hampshire d/b/a Eversource Energy | Adjustment to Stranded Cost Recovery Charge, Order Approving Adjustment to Stranded Cost Recovery Charge |
26,386 | 7/31/20 | DE 20-085 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition to Change Transmission Cost Adjustment Mechanism Rates, Order Approving Change to Transmission Cost Adjustment Mechanisms Rates |
26,385 | 7/28/20 | DG 20-078 | Northern Utilities, Inc. | Petition for Authority to Issue Securities. It is an Order Approving Financing Petition |
26,384 | 7/27/20 | DT 19-041 | Consolidated Communications of Northern New England Company, LLC d/b/a Consolidated Communications – NNE | Petition for Approval of Modifications to the Wholesale Performance Plan, Order Approving Joint Settlement Stipulation |
26,383 | 7/24/20 | DW 19-084 DW 20-055 |
Pennichuck Water Works, Inc. | Request for Changes in Rates and Petition for Financing Approval, Order Approving Maximum Revenue Requirement, Ratemaking Mechanism Modifications and Financing |
26,382 | 7/23/20 | DG 19-126 | Northern Utilities, Inc. | 2019-2024 Integrated Resource Plan, Order Approving Settlement Agreement |
26,381 | 7/21/20 | DW 19-031 | Hampstead Area Water Company, Inc. | Petition to Expand Franchise – Sandown, Order Nisi Approving Limited Franchise Expansion |
26,380 | 07/13/20 | DT 20-100 | Dunbarton Telephone Company, Inc. | Petition of Dunbarton Telephone Company, Inc. for Emergency Modification of Service Territory Boundary, Order Nisi Approving Franchise Boundary Change |
26,379 | 7/8/20 | IR 20-089 | ALL PUBLIC UTILITIES AND NEW HAMPSHIRE ELECTRIC COOPERATIVE, INC. | Investigation into the Effects of the COVID-19 Emergency on Utilities and Utility Customers, Order Denying Petition for Emergency Rulemaking or Evidentiary Hearing and Scheduling Public Hearing This Order schedules a web-enabled remote public hearing for July 14, 2020 at 1:30 p.m. |
26,378 | 7/2/20 | DE 20-098 | Unitil Energy Systems, Inc. | Annual Reconciliation and Rate Filing for Stranded Costs and External Delivery Charge, Order Suspending Tariff and Scheduling a Hearing, This hearing is scheduled for July 20, 2020 at 1:30 p.m. |
26,377 | 6/30/20 | DE 19-064 | Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities | Petition for Permanent and Temporary Rates, Order Following Hearing on 2019 Step Adjustment |
26,376 | 6/30/20 | DE 19-064 | Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities | Petition for Permanent and Temporary Rates, Order Approving Settlement and Permanent Rates |
26,375 | 6/30/20 | DE 20-092 | Electric and Gas Utilities | 2021-2023 Triennial Energy Efficiency Plan. It is an Order Nisi Granting Motion to Extend Submission Date |
26,375 | 6/30/20 | DE 17-136 | Electric and Gas Utilities | 2021-2023 Triennial Energy Efficiency Plan. It is an Order Nisi Granting Motion to Extend Submission Date |
26,374 | 6/30/20 | DG 20-049 | Liberty Utilities (EnergyNorth Natural Gas) Corp. d/b/a Liberty Utilities | 2020 Cast Iron/Bare Steel Replacement Program Results, Order Approving Revised Delivery Rates |
26,373 | 6/30/20 | DW 19-084 | Pennichuck Water Works, Inc. | Request for Change in Rates, Order Approving Temporary Rates |
26,372 | 6/29/20 | DE 20-053 | Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities | 2020 Default Service Solicitations, Order Approving Solicitation Process and Resulting Rates |
26,371 | 6/22/20 | DE 19-139 | Public Service Company of New Hampshire d/b/a Eversource Energy | 2019 Least Cost Integrated Resource Plan, Order Granting Rehearing |
26,370 | 6/22/20 | DE 19-139 | Public Service Company of New Hampshire d/b/a Eversource Energy | 2019 Least Cost Integrated Resource Plan, Order Granting Revised Request for Confidential Treatment and Protective Order |
26,369 | 6/19/20 | DE 20-011 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Licenses to Construct and Maintain Electric Lines Over and Across the Isinglass River in Strafford and State-Owned Land in Rochester and Raymond, Order Nisi Granting Licenses |
26,368 | 6/18/20 | DE 20-054 | Public Service Company of New Hampshire d/b/a Eversource Energy | 2020 Energy Service Solicitation, Order Approving Adjustment to the Energy Service Rate for effect on August 1, 2020 |
26,367 | 6/17/20 | DW 18-187 | City of Dover | Request for Extension of Water Service Area in the Town of Rollinsford, Order Nisi Granting Franchise Expansion |
26,366 | 6/17/20 | DE 17-189 | Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities | Petition to Approve Batter Pilot Storage Program, Order Granting Motion for Confidential Treatment and Rule Waiver |
26,365 | 6/16/20 | DE 20-046 | Green Mountain Power Corporation | Petition for Authority to Discontinue Service, Order Nisi Granting Petition |
26,363 | 6/16/20 | DE 19-057 | Public Service Company of New Hampshire d/b/a Eversource Energy | Motion of AARP to Suspend Temporary Rates and Require Eversource to Update Its Testimony in Support of an Increase in Distribution Rates, Order Denying Motion to Suspend Temporary Rates and Granting, in Part, Motion to Require Eversource to Update its Testimony |
26,364 | 6/15/20 | DE 17-189 | Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities | Petition to Approve Battery Storage Pilot Program, Order Nisi Extending Phase 1 Battery Installation Deadlines |
26,362 | 6/3/20 | DE 19-139 | Public Service Company of New Hampshire d/b/a Eversource Energy | 2019 Least Cost Integrated Resource Plan, Order Approving Settlement Agreement |
26,361 | 5/28/20 | DE 19-057 | Public Service Company of New Hampshire d/b/a Eversource Energy | Staff Motion to Remove Electric Vehicle Investment from Proceeding, Order Addressing Motion |
26,360 | 5/28/20 | DE 18-056 | Lakes Region Water Company, Inc. | Investigation to Determine Rate Effects of Federal and State Corporate Tax Reductions, Order Denying Motion for Rehearing |
26,359 | 5/22/20 | DE 20-060 | Retail Energy Supply Association | Motion for Rehearing of Order No. 26,344, Order Dismissing Motion for Rehearing |
26,358 | 5/22/20 | IR 15-296 | Electric Distribution Utilities | Investigation into Grid Modernization, Order regarding Guidance on Utility Distribution System Planning And Order Requiring Continued Investigation |
26,356 | 5/21/20 | DE 19-172 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Licenses to Construct and Maintain Electric Lines Over and Across Otter Brook in the Town of Sullilvan, the North Branch River and an Unnamed Outflow Stream of Island Pond in the Town of Stoddard, and the Ashuelot River in the City of Keene. It is an Order Nisi Granting Licenses |
26,357 | 5/19/20 | DE 20-003 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Electric Lines Over and Across the Ammonoosuc River and Over and Across Land Owned by the State of New Hampshire in the Town of Lisbon, Order Nisi Granting Crossing License |
26,355 | 5/11/20 | DE 19-149 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Licenses to Construct and Maintain Lines Over and Across the North Branch River in the Towns of Hillsborough and Antrim, and Over and Across Steels Pond and Land Owned by the State of New Hampshire in Antrim |
26,354 | 5/6/20 | DW 20-064 | Pennichuck Water Works, Inc. | Emergency Petition for Financing Approval Under the Federal Paycheck Protection Program, Order Approving Financing |
26,353 | 4/30/20 | DE 20-040 | Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities | Annual Rate Rate Adjustment. Order Approving Rate Adjustments |
26,352 | 4/30/20 | DE 20-036 | Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities | Calendar Year 2019 Reliability Enhancement and Vegetation Management Plan Results and Reconciliation, Order Approving Reconciliation |
26,351 | 4/30/20 | DG 20-041 | Liberty Utilities (EnergyNorth Natural Gas) Corp. d/b/a Liberty Utilities – Keene Division | Summer 2020 Cost of Gas, Order Approving Cost of Gas Rate |
26,350 | 4/22/20 | DE 19-139 | Public Service Company of New Hampshire d/b/a Eversource Energy | Order Granting in Part and Denying in Part Eversource’s Motion for Confidential Treatment and Protective Order |
26,349 | 4/15/20 | DE 15-302 | Residential Renewable Electric Generation Incentive Program, Order Nisi Modifying Application Process | |
26,348 | 4/13/20 | DW 19-084 | Pennichuck Water Works, Inc. | Request for Change in Rates, Order Suspending Temporary Rates Tariff and Scheduling Hearing |
26,347 | 4/10/20 | DE 20-039 | Unitil Energy Systems, Inc. | Petition for Approval of Energy Service Solicitation and Resulting Rates for Small, Medium, and Large Customer Groups Beginning June 1, 2020, Order Approving Petition |
26,346 | 4/7/20 | DE 10-212 | Renewable Energy Incentive Program | Renewable Energy Incentive Program for Commercial and Industrial Solar Projects, Order Nisi Temporarily Modifying Program Terms |
26,345 | 4/1/20 | DE 19-094 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Licenses to Construct and Maintain Electric Lines Over and Across the Squamscott River between the Towns of Stratham and Exeter, and Over and Across Land Owned by the State of New Hampshire in the Town of Sandown, Order Nisi Granting Licenses |
26,344 | 3/31/20 | Competitive Electric Power Suppliers and Competitive Natural Gas Suppliers | Order Implementing Governor’s Emergency Order #3 Pursuant to Executive Order 2020-04 Relative to Competitive Electric Power Suppliers and Competitive Natural Gas Suppliers | |
26,343 | 3/31/20 | ALL PUBLIC UTILITIES AND NEW HAMPSHIRE ELECTRIC COOPERATIVE, INC. | Order Implementing Governor’s Emergency Order #3 Pursuant to Executive Order 2020-04 | |
26,342 | 3/26/20 | DW 19-198 | Pennichuck East Utility, Inc. | Petition for License to Construct and Maintain a Water Main Under and Across Locke Lake in the Town of Barnstead. It is an Order Nisi Granting License. |
26,341 | 3/25/20 | DE 19-148 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Electric Lines Over and Across the Merrimack River between Bedford and Manchester and Across Lane Owned by State of New Hampshire in Bedford. It is an Order Nisi Granting License. |
26,340 | 3/26/20 | DW 18-056 | Lakes Region Water Company, Inc. | Investigation to Determine Rate Effects of Federal and State Corporate Tax Reductions. It is an Order Directing Lakes Region Water Company, Inc. to Record Corporate Liabilities. |
26,339 | 3/10/20 | DE 19-165 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Amended Licenses to Replace Shield Wire Over and Across the Pemigewasset River and Lake Winnisquam in the Towns of Franklin and Belmont. It is an Order Nisi Granting License |
26,338 | 3/10/20 | DE 19-094 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Licenses to Construct and Maintain Electric Lines Over and Across the Squamscott River in the Towns of Stratham and Exeter and Over and Across Land Owned by the State of New Hampshire in the Town of Sandown, Order Nisi Granting Licenses |
26,337 | 3/9/20 | DE 17-189 | Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities | Petition to Approve Battery Storage Pilot Program, Order Nisi Extending Phase 1 Battery Installations |
26,336 | 3/6/20 | DE 10-212 | Public Utilities Commission | Renewable Energy Incentive Program for Commercial and Industrial Solar Programs, Order Modifying Program Terms and Reopening Program |
26,335 | 3/6/20 | DE 19-203 | Electric Renewable Portfolio Standard | Adjustments to Renewable Portfolio Class Requirements, Order Declining to Modify 2019 Class III Compliance Obligation |
26,334 | 2/25/20 | DE 19-134 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Electric Lines Over and Across Franklin Pierce Lake in the Town of Antrim, Order Nisi Granting License |
26,333 | 2/18/20 | DE 19-142 | Public Service Company of New Hampshire d/b/a Eversource Energy | Rate Recovery of Costs in Excess of the Cumulative Reduction Cap Under the Power Purchase Agreement with Berlin Station LLC, Amended Order Approving Amendment to the Power Purchase Agreement |
25,330 | 2/5/20 | DE 19-095 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Electric Lines Over and Across the Squamscott River between the Towns of Stratham and Exeter, Order Nisi Granting License |
26,332 | 1/31/20 | DE 19-108 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for Adjustment to Stranded Cost Recovery Charge Rate, Order Approving Adjustment |
26,331 | 1/31/20 | DE 19-142 | Public Service Company of New Hampshire d/b/a Eversource | Rate Recovery of Costs in Excess of the Cumulative Reduction Cap Under the Power Purchase Agreement with Berlin Station LLC, Order Approving an Amendment to the Power Purchase Agreement |
26,329 | 1/30/20 | DW 19-177 | Lakes Region water Company, Inc. – Dockham Shores | Request for Changes in Rates, Order Suspending Proposed Tariffs and Scheduling Prehearing Conference |
26,328 | 1/23/20 | DE 19-148 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Electric Lines Over and Across the Merrimack River between Bedford and Manchester and Across Land Owned by the State of New Hampshire in Bedford, Order Nisi Granting License |
26,327 | 1/22/20 | DE 19-099 | Public Service Company of New Hampshire, d/b/a Eversource Energy | Petition for licenses to Construct and Maintain Electric Lines Over and Across the Ashuelot River and Land Owned by the State in Winchester, New Hampshire, Order Nisi Granting Licenses |
26,326 | 1/15/20 | DE 19-176 | Hampstead Area Water Company, Inc. | Petition to Approve Financing. Order Approving Petition |
26,325 | 1/14/20 | DE 19-110 | Public Service Company of New Hampshire d/b/a Eversource Energy | Petition for License to Construct and Maintain Electric Lines Over and Across Land Owned by the State of New Hampshire in Fitzwilliam, New Hampshire, Order Nisi Granting License |
26,324 | 1/10/20 | DE 19-184 | New Hampshire Electric Cooperative, Inc. and Eversource Energy | Joint Petition of New Hampshire Electric Cooperative, Inc. and Eversource Energy to Alter Franchise Areas in Barnstead, Order Nisi Approving Franchise Boundary Change |